Production rates will change dramatically depending on the quality of work that needs to be performed. A wall that is put in a museum takes longer than one in a warehouse. Also the level of finish would be higher in a museum than it would be in a warehouse. Make sure that you include the correct production rates for the project that you are bidding.
Quality Of Work
This entry was written by Justin Short and posted on September 18, 2009 at 9:33 am and filed under Friday Tips with tags Competitive bidding practices, Construction, Estimate, estimator, Tempest Company. Bookmark the permalink. Follow any comments here with the RSS feed for this post. Post a comment or leave a trackback: Trackback URL.
